A-A-1628
fiberboard. Roll the labels once in each direction with a soft rubber covered hinged iron roller. To be considered satisfactory, the labels shall immediately tack to the surface without curling or tearing. After two hours elapsed, the adhesive quality shall be considered satisfactory if: the labels cannot be removed from the test surfaces without fiber separation.
4. QUALITY ASSURANCE:
Responsibility for Inspection. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government.
The contractor shall certify and maintain substantiating evidence that the product offered meets the salient characteristics of this commercial item description, and that the product conforms to the producer’s own drawings, specifications, and quality assurance practices. The government reserves the right to require proof of such conformance prior to first delivery and thereafter as may be otherwise provided for under the provisions of the contract.
Each lot of Paper Labels shall be inspected for conformance to the requirements herein. Sampling for inspection shall be in accordance with MIL-STD-105 using the plans specified below.
A. Visual characteristics- For visual characteristics, Inspection level II with an Acceptable Quality Level (AQL) of 2.5 percent defective. The sample unit shall be five labels.
B. Dimensional characteristics- For dimensional characteristics, Inspection Level S-2 with Acceptable Quality Level (AQL) of 4.0 percent defective. The sample unit shall be five labels.
C. Sampling for end item testing- Inspection level S-1 with an Acceptable Quality Level (AQL) of 4.0 percent defective. The sample unit shall be five labels selected random from the issue unit. Not more than five labels shall be selected from any one issue unit. Characteristics of the component paper stock tested for conformance to the requirements in Section 1 do not have to be retested under end item testing. A certified test report is evidence that the paper has passed the required test.
5. PREPARATION FOR DELIVERY:
Packaging, packing and marking shall be as specified in the contract or purchase order.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business